Substation Scout

Falls substation interconnection queue

1 active project totalling 1.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
1.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
U2-076 Grows North LF n/r 10 Gas Withdrawn
T20 Exelon Epuron Solar Energy Center n/r 1.1 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.