Falls substation interconnection queue
1 active project totaling 1.1 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Falls as the point of interconnection, all in Bucks County, PA.
Target commercial operation dates as filed run from Dec 2008 to Mar 2011 (2 filings).
1active projects
1.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| U2-076 | Grows North LF | n/r | 10 | Gas | Withdrawn | Mar 2011 |
| T20 | Exelon Epuron Solar Energy Center | n/r | 1.1 | Solar | In Service | Dec 2008 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.