Chester, PA interconnection queue

3 active projects totalling 4.9 MW in the PJM queue, plus 11 with terminal status (shown greyed).

3active projects
4.9active MW
14total filed
Queue IDProjectkVMWResourceStatus
B25 Cromby 230kV 230 870 Gas Withdrawn
I08 Cromby 230kV 230 870 Gas Withdrawn
B18 Limerick-Cromby 230kV 230 750 Gas Withdrawn
AE1-234 Nottingham 230kV Reactor Bypass 230 578 Not reported Withdrawn
AB1-019 Newlinville 230 kV 230 100 Not reported Withdrawn
AF1-174 Ch-Goosetown Solar 34.5 12 Solar Withdrawn
AG2-372 Lock 34.5 kV 34.5 6 Solar Withdrawn
AF1-137 Ch-Valley Solar 34.5 5.9 Solar Withdrawn
W3-166 Nottingham I n/r 5.7 Solar Withdrawn
W3-167 Nottingham II n/r 3.8 Solar Withdrawn
V3-041 SECCRA Units 1, 2 & 3 n/r 3.2 Gas In Service
AH2-062 TBD 34kV 34 3 Solar Withdrawn
N26 SECCRA LF n/r 1.7 Gas In Service
O36 Honeybrook 12 0 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.