Substation Scout

Southampton substation interconnection queue

2 active projects totalling 81.1 MW in the PJM queue, plus 5 with terminal status (shown greyed).

2active projects
81.1active MW
7total filed
Queue IDProjectkVMWResourceStatus
C01-2140 Southampton 115 kV 115 80 Battery Active
W3-030 1626 Route 70 13 1.9 Solar Withdrawn
V4-005 Lumberton SP 13.8 1.1 Solar In Service
AE2-076 Southampton 13.2 kV 13.2 0.8 Solar Withdrawn
W1-102 Southampton 13kV 13 0.7 Solar Withdrawn
W2-058 Southampton 13kV 13 0.4 Solar Withdrawn
AE2-085 Southampton 13.2 kV 13.2 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.