Cookstown-Fort Dix substation interconnection queue

2 active projects totalling 4.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
4.5active MW
3total filed
Queue IDProjectkVMWResourceStatus
W2-089 Cookstown-Fort Dix 34.5kV 34.5 6.5 Solar Withdrawn
W4-025 North Run Solar 34.5 2.6 Solar In Service
X4-015 Jacobstown III Solar Farm 34 1.9 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.