Mt. Holly substation interconnection queue
1 active project totalling 2.7 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
2.7active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W2-087 | Mt. Holly 26kV | 26 | 3.8 | Solar | Withdrawn |
| W2-102 | West Pemberton Solar | 26.4 | 2.7 | Solar | In Service |
| X2-015 | Mt. Holly 26kV | 26 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.