Deptford substation interconnection queue

1 active project totaling 1.9 MW in the PJM queue, plus 5 with terminal status (shown grayed).

6 PJM queue filings name Deptford as the point of interconnection, all in NJ.

Target commercial operation dates as filed run from Aug 2011 to Mar 2020 (6 filings).

1active projects
1.9active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
W2-020 Deptford 13kV 13 1.9 Solar Withdrawn Aug 2011
W2-021 Deptford 13kV 13 1.9 Solar Withdrawn Aug 2011
X1-021 Deptford Solar 13 1.9 Solar Withdrawn Sep 2017
Y2-081 Deptford (Kinsley Solar)13kV 13 1.9 Solar In Service Nov 2014
W1-083 West Deptford Solar 13 1.7 Solar Withdrawn Jun 2012
AE2-144 Deptford 13.2 kV 13.2 0 Hybrid Withdrawn Mar 2020

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Camden County, NJ

All 46 PJM queue filings in Camden County, NJ.

Other PJM queue substations in Burlington County, NJ

All 118 PJM queue filings in Burlington County, NJ, including 2 more substations.

Other PJM queue substations in Gloucester County, NJ

All 88 PJM queue filings in Gloucester County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first