Deptford substation interconnection queue

1 active project totalling 1.9 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
1.9active MW
6total filed
Queue IDProjectkVMWResourceStatus
W2-020 Deptford 13kV 13 1.9 Solar Withdrawn
W2-021 Deptford 13kV 13 1.9 Solar Withdrawn
X1-021 Deptford Solar 13 1.9 Solar Withdrawn
Y2-081 Deptford (Kinsley Solar)13kV 13 1.9 Solar In Service
W1-083 West Deptford Solar 13 1.7 Solar Withdrawn
AE2-144 Deptford 13.2 kV 13.2 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.