Chalk Point substation interconnection queue
2 active projects totalling 676.2 MW in the PJM queue, plus 3 with terminal status (shown greyed).
2active projects
676.2active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-552 | Chalk Point 230 kV | 230 | 670.2 | Hybrid | Active |
| U2-081 | Chalk Point 230kV | 230 | 600 | Gas | Withdrawn |
| U2-083 | Chalk Point 230kV | 230 | 400 | Gas | Withdrawn |
| G35 | Chalk Point | n/r | 340 | Gas | Withdrawn |
| F08 | Chalk Point | 230 | 6 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.