Cookstown-New Lisbon substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-254 NJ Land Phase II 34.5 4.2 Solar Withdrawn
AE2-015 Cookstown-New Lisbon 34.5 kV 34.5 3.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.