Kanawha River - Carbondale substation interconnection queue
2 active projects totaling 117.8 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Kanawha River - Carbondale as the point of interconnection, all in WV.
Target commercial operation dates as filed run from Dec 2024 to Nov 2028 (3 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (2 filings).
2active projects
117.8active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1282 | Kanawha River - Carbondale 138 kV | 138 | 80 | Battery | Active | Nov 2028 |
| AG2-656 | Kanawha River - Carbondale 138 kV | 138 | 60 | Solar | Withdrawn | Dec 2024 |
| AG2-657 | Kanawha River - Carbondale 138 kV | 138 | 37.8 | Solar | Active | Nov 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fayette County, WV
- Kanawha River: 1 active, 30 MW of 4 filed
- Kanawha: 1 active, 5.5 MW of 3 filed
- Carbondale: none active of 2 filed
- Layland: none active of 2 filed
- Nuttall: none active of 2 filed
Other PJM queue substations in Kanawha County, WV
- TBD: none active of 20 filed
- Cabin Creek: none active of 3 filed
- Carbondale: none active of 2 filed