Substation Scout

Grand Point substation interconnection queue

1 active project totalling 23.3 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
23.3active MW
5total filed
Queue IDProjectkVMWResourceStatus
M06 Grand Point n/r 30.5 Other Withdrawn
I12 Orchard Park Generating Station 69 23.3 Other In Service
N30 Grand Point 12kV 12 5 Gas Withdrawn
W1-064 Grand Point 12kV 12 1.6 Gas Withdrawn
T192 Grand Point 12kV 12 0 Hydro Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.