Substation Scout

Northumberland, PA interconnection queue

7 active projects totalling 129.7 MW in the PJM queue, plus 29 with terminal status (shown greyed).

7active projects
129.7active MW
36total filed
Queue IDProjectkVMWResourceStatus
R26 Sunbury - Susquehanna 500kV 500 940 Coal Withdrawn
C01-1219 Eldred - Cleveland 69 kV 69 50 Wind Active
AE2-042 Northumberland Solar 69 43.5 Solar In Service
AG2-430 Sunbury-Dalmatia 69 kV II 69 37.7 Solar Withdrawn
AE1-127 Eldred-Sunbury 69 kV 69 32.1 Solar Withdrawn
AI2-388 Milton 69 kV 69 20.2 Solar Withdrawn
AG1-050 Milton 69 kV 69 20 Battery Withdrawn
AA1-057 Northumberland Wood Fired Power Plant 69 16 Other Withdrawn
AH1-470 Derry Tap- Derry Bus 69 kV IV 69 15 Solar Withdrawn
AH1-390 THP Solar 1 69 14.1 Solar Withdrawn
S41 IntelliWatt 69 12.5 Other Withdrawn
AF2-424 Shamrock Energy Center 69 12 Solar Under Construction
AH1-405 Exchange Tap I 69 kV 69 12 Solar Withdrawn
AH1-406 Exchange Tap 69 kV II 69 12 Solar Withdrawn
AH1-407 Exchange Tap 69 kV III 69 12 Solar Withdrawn
AF2-444 Reed-Reed Tap #2 69 kV 69 11.8 Solar Withdrawn
AF2-445A Norwegian Solar 69 11.8 Solar Withdrawn
C01-1029 Reed - Reed Tap #1 69 kV 69 11.7 Solar Active
AE2-058 Cherokee-Milton 69 kV 69 8.4 Solar Withdrawn
AE2-059 Cottontail Solar 4 aka East Chilli Solar 69 8.4 Solar In Service
AG1-259 Boyles Run Solar 69 6.7 Solar Pending Termination
AG1-260 Boyles Run Solar 69 6.7 Solar Pending Termination
AG2-481 Derry Tap-Derry Bus 69 kV III 69 4.1 Solar Active
AG1-336 ASD Hilcrest PA2 Solar 12.5 3.8 Hybrid Withdrawn
S42 Penn Wind n/r 3.6 Wind Withdrawn
AH1-192 Sunbury-Columbia 69kV 69 3.3 Solar Withdrawn
AH1-193 Sunbury-Danville 69 kV 69 2.6 Solar Withdrawn
V2-011 Sunbury-Milton 69kV 69 2.1 Solar Withdrawn
V2-027 South Milton n/r 1.6 Gas Withdrawn
AG2-154 Danville 12 kV 12 0.5 Solar Withdrawn
N06 Pine Hurst Acres 12 0 Gas In Service
AF2-284 NO-Oakes 12.5 0 Hybrid Withdrawn
AF2-289 NO-Vincent 12.5 0 Hybrid Withdrawn
AF2-427 Glidepath Ventures 12.5 0 Hybrid Withdrawn
AG2-601 Milton 69 kV III 69 0 Battery Withdrawn
AH1-509 TBD 12 kV 12 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.