Lumberton substation interconnection queue
2 active projects totalling 6.8 MW in the PJM queue, plus 12 with terminal status (shown greyed).
2active projects
6.8active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W2-090 | Stacy Haines Road | 230 | 7.6 | Solar | Withdrawn |
| W3-057 | Warfield II | 69 | 7.6 | Solar | Withdrawn |
| W3-055 | Lumberton 69kV | 69 | 4.6 | Solar | Withdrawn |
| X3-043 | Warfield I | 69 | 4.6 | Solar | Withdrawn |
| W2-056 | Reeves Station Road Solar | 13 | 4.2 | Solar | In Service |
| X1-050 | Lumberton 69kV | 69 | 3.8 | Solar | Withdrawn |
| X1-051 | Lumberton 69kV | 69 | 3.8 | Solar | Withdrawn |
| X1-052 | Lumberton 69kV | 69 | 3.8 | Solar | Withdrawn |
| W3-056 | Lumberton 69kV | 69 | 3 | Solar | Withdrawn |
| AB1-025 | Lumberton Solar | 13 | 2.6 | Solar | In Service |
| W3-038 | Trotter Property | 13 | 1.9 | Solar | Withdrawn |
| AE2-162 | Lumberton 13.2 kV | 13.2 | 1.3 | Hybrid | Withdrawn |
| V2-015 | Lumberton 13.2kV | 13.2 | 1.3 | Solar | Withdrawn |
| AB2-159 | Lumberton 13kV | 13 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.