Burches Hill substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).
0active projects
0active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| E22 | Burches Hill 500kV | 500 | 960 | Gas | Withdrawn |
| V3-001 | Burches Hill 500kV | 500 | 750 | Gas | Withdrawn |
| W1-034 | Burches Hill | n/r | 750 | Gas | Withdrawn |
| C04 | Burches Hill 230kV | 230 | 550 | Gas | Withdrawn |
| AG2-313 | Burches Hill 230 kV | 230 | 35.3 | Gas | Withdrawn |
| C01-2150 | Burches Hill 230 kV | 230 | 35 | Gas | Withdrawn |
| AG1-094 | Burches Hill 230 kV | 230 | 0 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.