Guilford substation interconnection queue
2 active projects totalling 100 MW in the PJM queue, plus 6 with terminal status (shown greyed).
2active projects
100active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| E04_W20 | Guilford 138 kV | 138 | 88 | Gas | In Service |
| AD2-110 | Chambersburg Energy, LLC | 138 | 12 | Gas | In Service |
| AF1-209 | FR Boyer Mill 2 | 34.5 | 9.5 | Solar | Withdrawn |
| AG1-515 | Chambersburg Energy | 138 | 4 | Battery | Withdrawn |
| W2-095 | Guilford 34.5kV | 34.5 | 3.8 | Solar | Withdrawn |
| X1-086 | Guilford 34.5kV | 34.5 | 3.7 | Solar | Withdrawn |
| AF2-275 | FR-Social Island | 12.5 | 0 | Hybrid | Withdrawn |
| AF2-276 | FR-Statler | 12.5 | 0 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.