Guilford substation interconnection queue

2 active projects totalling 100 MW in the PJM queue, plus 6 with terminal status (shown greyed).

2active projects
100active MW
8total filed
Queue IDProjectkVMWResourceStatus
E04_W20 Guilford 138 kV 138 88 Gas In Service
AD2-110 Chambersburg Energy, LLC 138 12 Gas In Service
AF1-209 FR Boyer Mill 2 34.5 9.5 Solar Withdrawn
AG1-515 Chambersburg Energy 138 4 Battery Withdrawn
W2-095 Guilford 34.5kV 34.5 3.8 Solar Withdrawn
X1-086 Guilford 34.5kV 34.5 3.7 Solar Withdrawn
AF2-275 FR-Social Island 12.5 0 Hybrid Withdrawn
AF2-276 FR-Statler 12.5 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.