Fairfield Township substation interconnection queue

1 active project totalling 3.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
3.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
V4-054 NJ Oak Solar 12 3.8 Solar In Service
W1-097 Fairfield Township 12kV 12 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.