Substation Scout

Clayville substation interconnection queue

2 active projects totalling 64.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
64.5active MW
3total filed
Queue IDProjectkVMWResourceStatus
V2-021 Clayville n/r 64 Other Withdrawn
W2-039 Clayville Unit #1 69 63 Gas In Service
V2-041 Vineland-Mays Landing 12 1.5 Solar In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.