Berlin substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

Target commercial operation dates as filed run from Apr 2011 to Mar 2017 (4 filings).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
W1-090 Berlin 69kV 69 6.8 Solar Withdrawn Apr 2011
AB1-168 Berlin 12kV 12 1.7 Solar Withdrawn Mar 2017
O60 AMP Berlin WF 23 1.1 Wind Withdrawn Jan 2012
W1-091 Berlin 12kV 12 1 Solar Withdrawn Apr 2011

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Camden County, NJ

All 46 PJM queue filings in Camden County, NJ.

Other PJM queue substations in Somerset County, PA

All 107 PJM queue filings in Somerset County, PA.