Endless Caverns substation interconnection queue

2 active projects totaling 200 MW in the PJM queue, plus 3 with terminal status (shown grayed).

5 PJM queue filings name Endless Caverns as the point of interconnection, all in Rockingham County, VA.

Target commercial operation dates as filed run from Jan 2019 to Apr 2029 (5 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: Dominion (2 filings).

2active projects
200active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-028 Prospect Power 115 150 Battery Partially in Service - Under Construction May 2026
AG1-151 Endless Caverns 115 kV 115 100 Battery Withdrawn Oct 2023
C01-1383 Endless Caverns 115 kV 115 50 Battery Active Apr 2029
AD1-080 Endless Caverns 34.5 kV 34.5 12.3 Solar Withdrawn Jan 2019
AE1-098 Endless Caverns Solar 34.5 10.4 Solar Withdrawn Jun 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Rockingham County, VA

All 26 PJM queue filings in Rockingham County, VA.