Endless Caverns substation interconnection queue
2 active projects totalling 200 MW in the PJM queue, plus 3 with terminal status (shown greyed).
2active projects
200active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-028 | Prospect Power | 115 | 150 | Battery | Partially in Service - Under Construction |
| AG1-151 | Endless Caverns 115 kV | 115 | 100 | Battery | Withdrawn |
| C01-1383 | Endless Caverns 115 kV | 115 | 50 | Battery | Active |
| AD1-080 | Endless Caverns 34.5 kV | 34.5 | 12.3 | Solar | Withdrawn |
| AE1-098 | Endless Caverns Solar | 34.5 | 10.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.