Vineland substation interconnection queue

2 active projects totalling 80 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
80active MW
4total filed
Queue IDProjectkVMWResourceStatus
S121 Howard M. Down Power Plant Unit 11 69 63 Gas In Service
S43 Vineland Unit #9 n/r 17 Other In Service
Y1-042 Vineland 12kV 12 1.3 Solar Withdrawn
X3-018 Vineland 12kV 12 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.