Wagner substation interconnection queue
1 active project totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
5 PJM queue filings name Wagner as the point of interconnection, all in MD.
Target commercial operation dates as filed run from Apr 2007 to Jun 2029 (5 filings).
Transmission owner as filed: BGE (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1552 | Wagner 115 kV | 115 | 50 | Battery | Withdrawn | Jun 2029 |
| C01-1553 | Wagner 115 kV | 115 | 50 | Battery | Withdrawn | Jun 2029 |
| AG2-225 | Wagner 115 kV | 115 | 46 | Battery | Withdrawn | Dec 2022 |
| AG1-290 | Wagner 115 kV | 115 | 4 | Battery | Withdrawn | Oct 2021 |
| Q31 | Hawkins Point | 34 | 0 | Gas | In Service | Apr 2007 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Wagner (BGE, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-28 | C01-1552 | Terminal status | 50 | Active → Withdrawn |
| 2026-09-28 | C01-1553 | Terminal status | 50 | Active → Withdrawn |
Other PJM queue substations in Anne Arundel County, MD
- Waugh Chapel: 1 active, 490 MW of 5 filed
- Brandon Shores: 2 active, 410.4 MW of 5 filed
- Riverside: 3 active, 250 MW of 5 filed
- Pumphrey: 1 active, 155 MW of 4 filed
- Todd: 4 active, 46.9 MW of 16 filed
Other PJM queue substations in Baltimore County, MD
- Riverside: 3 active, 250 MW of 5 filed
- Pumphrey: 1 active, 155 MW of 4 filed
- Otter Point: 2 active, 8.5 MW of 2 filed
- TBD: none active of 20 filed
- Northeast-CP Crane: none active of 2 filed