Wagner substation interconnection queue
3 active projects totalling 100 MW in the PJM queue, plus 2 with terminal status (shown greyed).
3active projects
100active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1552 | Wagner 115 kV | 115 | 50 | Battery | Active |
| C01-1553 | Wagner 115 kV | 115 | 50 | Battery | Active |
| AG2-225 | Wagner 115 kV | 115 | 46 | Battery | Withdrawn |
| AG1-290 | Wagner 115 kV | 115 | 4 | Battery | Withdrawn |
| Q31 | Hawkins Point | 34 | 0 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.