Wagner substation interconnection queue

3 active projects totalling 100 MW in the PJM queue, plus 2 with terminal status (shown greyed).

3active projects
100active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1552 Wagner 115 kV 115 50 Battery Active
C01-1553 Wagner 115 kV 115 50 Battery Active
AG2-225 Wagner 115 kV 115 46 Battery Withdrawn
AG1-290 Wagner 115 kV 115 4 Battery Withdrawn
Q31 Hawkins Point 34 0 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.