Hamilton substation interconnection queue
2 active projects totalling 500 MW in the PJM queue, plus 3 with terminal status (shown greyed).
2active projects
500active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1882 | Hamilton 230 kV | 230 | 500 | Battery | Active |
| AG1-482 | Hamilton Solar and BESS | 115 | 20 | Hybrid | Withdrawn |
| AE1-138 | Hamilton 115 kV | 115 | 13.2 | Solar | Withdrawn |
| X3-069 | Hamilton | n/r | 4 | Solar | Withdrawn |
| N06 | Pine Hurst Acres | 12 | 0 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.