Hamilton substation interconnection queue

2 active projects totalling 500 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
500active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1882 Hamilton 230 kV 230 500 Battery Active
AG1-482 Hamilton Solar and BESS 115 20 Hybrid Withdrawn
AE1-138 Hamilton 115 kV 115 13.2 Solar Withdrawn
X3-069 Hamilton n/r 4 Solar Withdrawn
N06 Pine Hurst Acres 12 0 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.