Prince George's County substation interconnection queue
1 active project totalling 0.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
0.8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA2-168 | Prince George's County | n/r | 1.5 | Solar | Withdrawn |
| AB2-157 | Rollins Avenue Phoenix | 12 | 0.8 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.