Otter Point substation interconnection queue

2 active projects totalling 8.5 MW in the PJM queue.

2active projects
8.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
M19 Otter Point LF-1 n/r 4.5 Gas In Service
Y2-100 Eastern Landfill Gas 34.5 4 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.