Roadstown substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Roadstown as the point of interconnection, all in Cumberland County, NJ.
Target commercial operation dates as filed run from Sep 2023 to Jun 2028 (2 filings).
Transmission owner as filed: AEC (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2203 | Roadstown 69 kV | 69 | 105 | Battery | Withdrawn | Jun 2028 |
| AG2-241 | Roadstown 69 kV | 69 | 31.3 | Solar | Withdrawn | Sep 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Cumberland County, NJ
- Orchard - Cumberland: 2 active, 500 MW of 2 filed
- Landis: 1 active, 325 MW of 2 filed
- Cumberland: 2 active, 97.5 MW of 10 filed
- Vineland: 2 active, 80 MW of 4 filed
- Clayville: 2 active, 64.5 MW of 3 filed
- Carll's Corner: 1 active, 63.8 MW of 3 filed
- Sherman Ave - West Vineland: 2 active, 32 MW of 2 filed
- Sherman Ave: 1 active, 12.4 MW of 3 filed
- Carlls Corner: 1 active, 4.8 MW of 8 filed
- Fairfield Township: 1 active, 3.8 MW of 2 filed
- TBD: none active of 20 filed
- Minotola: none active of 5 filed
- Newport: none active of 4 filed
- Bridgeton: none active of 3 filed
- Churchtown-Cumberland: none active of 2 filed
- Fairton: none active of 2 filed
- Millville: none active of 2 filed
- Newport-South Millville: none active of 2 filed
- Stow Creek Township: none active of 2 filed
- Upper Deerfield: none active of 2 filed