Substation Scout

Warfordsburg substation interconnection queue

1 active project totaling 12 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Warfordsburg as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Dec 2023 to Nov 2024 (2 filings).

1active projects
12active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-054 Blairs Valley 34 12 Solar In Service Nov 2024
AG2-374 Warfordsburg 12 kV 12 3 Solar Withdrawn Dec 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Warfordsburg” in PA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Franklin County, PA

All 80 PJM queue filings in Franklin County, PA.

Other PJM queue substations in Tioga County, PA

All 21 PJM queue filings in Tioga County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first