Riverside substation interconnection queue
3 active projects totalling 250 MW in the PJM queue, plus 2 with terminal status (shown greyed).
3active projects
250active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1564 | Riverside 115 kV | 115 | 150 | Battery | Active |
| S33 | Riverside | n/r | 85 | Gas | Withdrawn |
| C01-1565 | Riverside 115 kV | 115 | 50 | Battery | Active |
| C01-1566 | Riverside 115 kV | 115 | 50 | Battery | Active |
| AB1-075 | Riverside 115kV | 115 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.