North Hanover substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AF1-309 North Hanover 115 kV 115 19.2 Solar Withdrawn
AG2-649 North Hanover 13.2 kV 13.2 6.2 Solar Withdrawn
W3-169 North Hanover 12.5kV 12.5 4.6 Solar Withdrawn
X2-062 North Hanover n/r 1.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.