Eddystone substation interconnection queue
2 active projects totaling 528 MW in the PJM queue, plus 3 with terminal status (shown grayed).
5 PJM queue filings name Eddystone as the point of interconnection, all in Delaware County, PA.
Target commercial operation dates as filed run from Jan 2002 to Jun 2019 (5 filings).
2active projects
528active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| U1-013 | Eddystone | n/r | 630 | Gas | Withdrawn | Jan 2013 |
| AA2-110 | Eddystone 230kV | 230 | 550 | Gas | Withdrawn | Jun 2019 |
| A19 | Liberty (Eddy) | 230 | 521 | Gas | In Service | Jan 2002 |
| M27 | Eddystone | 138 | 7 | Coal | In Service | Jun 2004 |
| AB1-073 | Eddystone 138kV | 138 | 0 | Battery | Withdrawn | Dec 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.