6 active projects totalling 446 MW in the PJM queue, plus 28 with terminal status (shown greyed).
6active projects
446active MW
34total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| H05 | Riverside 230/115kV | 115 | 600 | Gas | Withdrawn |
| AH1-736 | Not reported | n/r | 300 | Battery | Withdrawn |
| AJ1-037 | Northeast - CP Crane 115 kV | 115 | 300 | Battery | Withdrawn |
| C01-1648 | C.P Crane - Northeast 115 kV | 115 | 300 | Battery | Active |
| AF1-037 | C.P. Crane 115 kV | 115 | 200 | Battery | Withdrawn |
| AH2-162 | Northeast-CP Crane 115kV | 115 | 200 | Battery | Withdrawn |
| C01-1982 | CP Crane - Northeast 115 kV | 115 | 150 | Battery | Withdrawn |
| AD2-104 | Crane CT 2-3-4 115kV | 115 | 144.6 | Gas | Withdrawn |
| AH1-261 | Pulaski Energy Storage | 230 | 135 | Battery | Active |
| AI1-189 | Northeast - Windy Edge 115 kV | 115 | 110 | Battery | Withdrawn |
| U1-036 | Steel Side 115 kV | 115 | 100 | Gas | Withdrawn |
| S33 | Riverside | n/r | 85 | Gas | Withdrawn |
| AI1-130 | Northeast-CP Crane 115kV | 115 | 75 | Battery | Withdrawn |
| AI1-131 | TBD 115 kV | 115 | 75 | Battery | Withdrawn |
| T172 | Northwest | n/r | 20 | Battery | Withdrawn |
| AD2-103 | Crane CT 1 115kV | 115 | 14 | Other | Withdrawn |
| M19 | Otter Point LF-1 | n/r | 4.5 | Gas | In Service |
| G39 | Joppatowne 13kV | 13 | 4.2 | Gas | Withdrawn |
| AG1-290 | Wagner 115 kV | 115 | 4 | Battery | Withdrawn |
| Y2-100 | Eastern Landfill Gas | 34.5 | 4 | Gas | In Service |
| AG2-673 | Fitzell 33 kV | 33 | 3.7 | Solar | Withdrawn |
| AB2-184 | Monkton | n/r | 3.5 | Solar | Withdrawn |
| AG2-196 | Not reported | n/r | 3.5 | Solar | Withdrawn |
| E05 | Sparrow Point | 33 | 2.5 | Gas | In Service |
| AB2-126 | Finksburg 34kV | 34 | 1.4 | Solar | Withdrawn |
| AB1-005 | Harrisonville 13kV | 13 | 0 | Gas | Withdrawn |
| AB1-045 | East Towson 240v | n/r | 0 | Battery | Withdrawn |
| AB1-046 | Sudbrook Park 240v | n/r | 0 | Battery | Withdrawn |
| AB1-048 | Texas 240v | n/r | 0 | Battery | Withdrawn |
| AB1-051 | Lutherville 240v | n/r | 0 | Battery | Withdrawn |
| AB1-052 | Bengies 240v | n/r | 0 | Battery | Withdrawn |
| AB1-075 | Riverside 115kV | 115 | 0 | Battery | Withdrawn |
| AF2-028 | Pumphrey 115 kV | 115 | 0 | Not reported | Withdrawn |
| H13 | Owings Mills | n/r | 0 | Gas | In Service |