Substation Scout

Hawkins Gate / Oak Grove substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
A58 Hawkins Gate / Oak Grove 230kV 230 450 Gas Withdrawn
A61 Hawkins Gate / Oak Grove 230kV 230 450 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.