Derry Tap-Derry Bus III substation interconnection queue
1 active project totalling 4.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
4.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-469 | Derry Tap-Derry Bus 69 kV III | 69 | 15 | Hybrid | Withdrawn |
| AG2-481 | Derry Tap-Derry Bus 69 kV III | 69 | 4.1 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.