Bridgeton substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W2-015 | Bridgeton 12kV | 12 | 3.8 | Solar | Withdrawn |
| W3-109 | Bridgeton 12kV | 12 | 0.2 | Solar | Withdrawn |
| X1-091 | Bridgeton 12kV | 12 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.