Clayton substation interconnection queue

2 active projects totaling 153 MW in the PJM queue, plus 1 with terminal status (shown grayed).

Target commercial operation dates as filed run from May 2002 to Mar 2020 (3 filings).

2active projects
153active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
D11 DEMEC/Smyrna 1 &2 138 100 Gas In Service May 2002
W1-062 Smyrna Units 1 & 2 138 53 Gas In Service May 2012
AE2-088 Clayton 12 kV 12 0.7 Hybrid Withdrawn Mar 2020

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Kent County, DE

All 34 PJM queue filings in Kent County, DE.

Other PJM queue substations in Gloucester County, NJ

All 88 PJM queue filings in Gloucester County, NJ.