Clayton substation interconnection queue

2 active projects totalling 153 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
153active MW
3total filed
Queue IDProjectkVMWResourceStatus
D11 DEMEC/Smyrna 1 &2 138 100 Gas In Service
W1-062 Smyrna Units 1 & 2 138 53 Gas In Service
AE2-088 Clayton 12 kV 12 0.7 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.