Clayton substation interconnection queue
2 active projects totalling 153 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
153active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| D11 | DEMEC/Smyrna 1 &2 | 138 | 100 | Gas | In Service |
| W1-062 | Smyrna Units 1 & 2 | 138 | 53 | Gas | In Service |
| AE2-088 | Clayton 12 kV | 12 | 0.7 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.