Cheltenham substation interconnection queue

4 active projects totaling 1,266.3 MW in the PJM queue.

4 PJM queue filings name Cheltenham as the point of interconnection, all in Prince George's County, MD.

Target commercial operation dates as filed run from Nov 2027 to Apr 2031 (4 filings). 4 active filings target a date after November 27, 2026.

Transmission owner as filed: PEPCO (4 filings).

4active projects
1,266.3active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1494 Cheltenham 500 kV 500 618 Gas Active Apr 2031
C01-1268 Cheltenham 500 kV 500 400 Battery Active Apr 2029
C01-1132 Cheltenham 500 kV 500 200 Battery Active Apr 2029
AH1-744 PARKWAY GENERATION OPERATING LLC 500 48.3 Gas EP Nov 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-09-07AH1-744Status changen/a Active → EP

Other PJM queue substations in Prince George's County, MD

All 57 PJM queue filings in Prince George's County, MD.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first