Sherman Ave substation interconnection queue

1 active project totalling 12.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
12.4active MW
3total filed
Queue IDProjectkVMWResourceStatus
U1-029 Sherman Ave 138kV 138 110 Other Withdrawn
T55 Sherman Avenue Unit 1 n/r 12.4 Gas In Service
AF2-026 Sherman Ave 138 kV 138 12 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.