Substation Scout

Delaware, PA interconnection queue

12 active projects totalling 934.7 MW in the PJM queue, plus 15 with terminal status (shown greyed).

12active projects
934.7active MW
27total filed
Queue IDProjectkVMWResourceStatus
T38 Delco Tap 230kV 230 900 Gas Withdrawn
Y3-098 Printz n/r 735 Gas Withdrawn
U3-023 Printz 230kV 230 720 Gas Withdrawn
U1-013 Eddystone n/r 630 Gas Withdrawn
AA2-110 Eddystone 230kV 230 550 Gas Withdrawn
A19 Liberty (Eddy) 230 521 Gas In Service
E19 Delco Tap 230kV 230 330 Gas Withdrawn
O16 FPL Energy Markus Hook 230 230 Not reported In Service
AA2-140 Liberty Electric 230 35 Gas In Service
AC1-184 Printz n/r 35 Gas Withdrawn
X4-027 Phillips Island CT1, CT2,CT3 & ST4 230 35 Gas In Service
AD1-097 Phillips Island CT1, CT2, CT3, and ST4 230 34.8 Gas In Service
T129 Liberty 230 20 Gas In Service
U1-089 Kimberly Clark 69 20 Other Deactivated
Y2-064 Liberty Electric n/r 19 Gas In Service
AA2-076 Phillips Island CT1, CT2, CT3 & ST4 230 18 Gas In Service
AI1-029 Not reported n/r 13.8 Solar Withdrawn
AI1-076 TBD 13.2 kV 13.2 10.9 Solar Withdrawn
T118 Phillips Island CT1, CT2, CT3, CT4 230 10 Gas In Service
AF2-038 Printz 230 kV 230 8 Battery Withdrawn
D07 Sunoil Gen Unit 69 8 Gas Deactivated
M27 Eddystone 138 7 Coal In Service
AE2-010 Jericho 69 3 Gas In Service
AG1-251 Springfield CSG 1 12.5 1.9 Solar Suspended
AB1-073 Eddystone 138kV 138 0 Battery Withdrawn
AG1-158 Middletown 34.5 kV 34.5 0 Solar Withdrawn
X3-081 Astra Foods 13 0 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.