Mercersburg-Milnor substation interconnection queue
1 active project totalling 5.7 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
5.7active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| X3-062 | Mercersburg-Milnor 34.5kV | 34.5 | 7.6 | Solar | Withdrawn |
| X4-011 | Mercersburg-Milnor 34.5kV | 34.5 | 7.6 | Solar | Withdrawn |
| AB1-129 | Mercersburg-Milnor 34.5kV | 34.5 | 5.7 | Solar | Withdrawn |
| AD1-060 | Upton Solar | 34.5 | 5.7 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.