Cartanza substation interconnection queue

1 active project totalling 309.2 MW in the PJM queue, plus 6 with terminal status (shown greyed).

1active projects
309.2active MW
7total filed
Queue IDProjectkVMWResourceStatus
AA2-069 Garrison Energy Center 230 451 Gas Withdrawn
W3-032A Garrison Energy Center 230 309.2 Gas In Service
X2-067 Cartanza 230kV 230 309 Gas Withdrawn
AG1-497 Cartanza 230 kV 230 84 Hybrid Withdrawn
AH1-027 Cartanza 230 kV 230 15 Solar Withdrawn
AE1-038 Cartanza 69 kV 69 8.4 Solar Withdrawn
W3-087 Cartanza 230kV 230 5.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.