McConnellsburg-Guilford substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).

5 PJM queue filings name McConnellsburg-Guilford as the point of interconnection, all in PA.

Target commercial operation dates as filed run from May 2004 to Dec 2026 (5 filings).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AA1-045 McConnellsburg-Guilford 138kV 138 308 Gas Withdrawn Dec 2015
H27_W71 McConnellsburg-Guilford 138 kV 138 252 Gas Withdrawn May 2004
AH2-405 McConnellsburg-Guilford 138 kV 138 60 Solar Withdrawn Dec 2026
AE1-136 McConnellsburg-Guilford 138 kV 138 32 Solar Withdrawn Dec 2021
V3-062 McConnellsburg-Guilford 138kV 138 7.6 Solar Withdrawn Oct 2011

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Venango County, PA

All 36 PJM queue filings in Venango County, PA.

Other PJM queue substations in Fulton County, PA

All 17 PJM queue filings in Fulton County, PA.

Other PJM queue substations in Franklin County, PA

All 80 PJM queue filings in Franklin County, PA.