McConnellsburg-Guilford substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA1-045 | McConnellsburg-Guilford 138kV | 138 | 308 | Gas | Withdrawn |
| H27_W71 | McConnellsburg-Guilford 138 kV | 138 | 252 | Gas | Withdrawn |
| AH2-405 | McConnellsburg-Guilford 138 kV | 138 | 60 | Solar | Withdrawn |
| AE1-136 | McConnellsburg-Guilford 138 kV | 138 | 32 | Solar | Withdrawn |
| V3-062 | McConnellsburg-Guilford 138kV | 138 | 7.6 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.