McConnellsburg-Guilford substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AA1-045 McConnellsburg-Guilford 138kV 138 308 Gas Withdrawn
H27_W71 McConnellsburg-Guilford 138 kV 138 252 Gas Withdrawn
AH2-405 McConnellsburg-Guilford 138 kV 138 60 Solar Withdrawn
AE1-136 McConnellsburg-Guilford 138 kV 138 32 Solar Withdrawn
V3-062 McConnellsburg-Guilford 138kV 138 7.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.