New Meredith substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name New Meredith as the point of interconnection, all in Kent County, DE.
Target commercial operation dates as filed run from Nov 2021 to Apr 2022 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-112 | New Meredith 23 kV | 23 | 2.6 | Solar | Withdrawn | Apr 2022 |
| AG1-079 | TES Blue Hen Solar 23 | 69 | 0 | Solar | Withdrawn | Nov 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Kent County, DE
- Cartanza: 1 active, 309.2 MW of 7 filed
- Clayton: 2 active, 153 MW of 3 filed
- Dover: 1 active, 98 MW of 3 filed
- Todd: 4 active, 46.9 MW of 16 filed
- Harrington: 4 active, 39 MW of 8 filed
- Cedar Creek I: 2 active, 15.1 MW of 2 filed
- Cedar Creek II: 2 active, 15.1 MW of 2 filed
- Kent-Harrington: 2 active, 8 MW of 2 filed
- TBD: none active of 20 filed
- Milford: none active of 4 filed
- South Harrington: none active of 2 filed