Frostburg substation interconnection queue

3 active projects totalling 19.6 MW in the PJM queue, plus 3 with terminal status (shown greyed).

3active projects
19.6active MW
6total filed
Queue IDProjectkVMWResourceStatus
AI2-490 Frostburg 138 kV 138 31.9 Wind Withdrawn
AE2-289 Frostburg 138 kV 138 11.8 Wind Active
AE2-030 Frostburg 138kV 138 7.6 Solar Withdrawn
Z2-013 Twin Ridges Wind Farm 138 4.9 Wind In Service
AB2-041 Mason Dixon Wind Farm 138 3.7 Wind Withdrawn
AB2-038 Frostburg 138kV 138 2.9 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.