14 active projects totalling 370.2 MW in the PJM queue, plus 20 with terminal status (shown greyed).

14active projects
370.2active MW
34total filed
Queue IDProjectkVMWResourceStatus
X2-067 Cartanza 230kV 230 309 Gas Withdrawn
T40 South Harrington n/r 225 Gas Withdrawn
D11 DEMEC/Smyrna 1 &2 138 100 Gas In Service
A28 Kent n/r 98 Gas In Service
AG1-497 Cartanza 230 kV 230 84 Hybrid Withdrawn
W1-062 Smyrna Units 1 & 2 138 53 Gas In Service
C01-1646 Todd 69 kV 69 50 Battery Active
AH1-760 Not reported n/r 31 Battery Withdrawn
AG1-464 Harrington 69 kV 69 20 Battery Withdrawn
C01-1949 Harrington 69 kV 69 20 Solar Active
AH1-027 Cartanza 230 kV 230 15 Solar Withdrawn
AH1-574 Harrington 69kV 69 12 Solar Withdrawn
AH1-576 South Harrington 69kV 69 12 Solar Withdrawn
AE1-038 Cartanza 69 kV 69 8.4 Solar Withdrawn
AC2-184 Cedar Creek Solar 138 7.6 Solar Suspended
AC2-185 Cedar Creek Solar 138 7.6 Solar Suspended
AC2-187 Raceway Solar 69 7.6 Solar Under Construction
AC2-188 Raceway Solar 69 7.6 Solar Under Construction
Z1-099 City of Dover Generating Facilities 69 7 Gas In Service
AH1-575 Harrington 69kV 69 6 Solar Withdrawn
W3-087 Cartanza 230kV 230 5.7 Solar Withdrawn
AH1-662 Wells 69kV 69 5.4 Solar Withdrawn
C01-1214 Kent 69 kV 69 4 Gas Active
T12 Central LF Units 1-4 69 4 Gas In Service
AC2-186 Raceway Solar 25 3.8 Solar Under Construction
AH1-115 Not reported n/r 2.8 Solar Withdrawn
AH1-120 Felton 23kV 23 2.8 Solar Withdrawn
AH1-112 New Meredith 23 kV 23 2.6 Solar Withdrawn
AH1-105 TBD 23 kV 23 2.3 Solar Withdrawn
N44 Dover n/r 1 Other Withdrawn
AA1-091 Dover 12kV 12 0 Battery Withdrawn
AG1-079 TES Blue Hen Solar 23 69 0 Solar Withdrawn
J07_MTX12 Cheswold XFMR 138/69kV 69 0 Not reported In Service
Y3-054 Milford Solar 138 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.