Yardville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
X1-090 BKB Properties 138 3.8 Solar Withdrawn
Y1-009 Yardville 13kV 13 1.5 Solar Withdrawn
AE2-143 Yardville 13.2 kV 13.2 0 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.