Yardville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
X1-090 BKB Properties 138 3.8 Solar Withdrawn
Y1-009 Yardville 13kV 13 1.5 Solar Withdrawn
AE2-143 Yardville 13.2 kV 13.2 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.