Harrington substation interconnection queue
4 active projects totaling 39 MW in the PJM queue, plus 4 with terminal status (shown grayed).
8 PJM queue filings name Harrington as the point of interconnection, all in Kent County, DE.
Target commercial operation dates as filed run from Sep 2023 to Aug 2027 (8 filings). 4 active filings target a date after November 27, 2026.
Transmission owner as filed: DPL (1 filing).
4active projects
39active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-090 | Harrington 69 kV | 69 | 31 | Solar | Withdrawn | Mar 2025 |
| AG1-464 | Harrington 69 kV | 69 | 20 | Battery | Withdrawn | Sep 2023 |
| C01-1949 | Harrington 69 kV | 69 | 20 | Solar | Active | Aug 2027 |
| AH1-574 | Harrington 69kV | 69 | 12 | Solar | Withdrawn | Oct 2024 |
| AC2-187 | Raceway Solar | 69 | 7.6 | Solar | Under Construction | Aug 2027 |
| AC2-188 | Raceway Solar | 69 | 7.6 | Solar | Under Construction | Aug 2027 |
| AH1-575 | Harrington 69kV | 69 | 6 | Solar | Withdrawn | Oct 2024 |
| AC2-186 | Raceway Solar | 25 | 3.8 | Solar | Under Construction | Aug 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Kent County, DE
- Cartanza: 1 active, 309.2 MW of 7 filed
- Clayton: 2 active, 153 MW of 3 filed
- Dover: 1 active, 98 MW of 3 filed
- Todd: 4 active, 46.9 MW of 16 filed
- Cedar Creek I: 2 active, 15.1 MW of 2 filed
- Cedar Creek II: 2 active, 15.1 MW of 2 filed
- Kent-Harrington: 2 active, 8 MW of 2 filed
- TBD: none active of 20 filed
- Milford: none active of 4 filed
- New Meredith: none active of 2 filed
- South Harrington: none active of 2 filed
Site Scanner