Harrington substation interconnection queue

4 active projects totaling 39 MW in the PJM queue, plus 4 with terminal status (shown grayed).

8 PJM queue filings name Harrington as the point of interconnection, all in Kent County, DE.

Target commercial operation dates as filed run from Sep 2023 to Aug 2027 (8 filings). 4 active filings target a date after November 27, 2026.

Transmission owner as filed: DPL (1 filing).

4active projects
39active MW
8total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-090 Harrington 69 kV 69 31 Solar Withdrawn Mar 2025
AG1-464 Harrington 69 kV 69 20 Battery Withdrawn Sep 2023
C01-1949 Harrington 69 kV 69 20 Solar Active Aug 2027
AH1-574 Harrington 69kV 69 12 Solar Withdrawn Oct 2024
AC2-187 Raceway Solar 69 7.6 Solar Under Construction Aug 2027
AC2-188 Raceway Solar 69 7.6 Solar Under Construction Aug 2027
AH1-575 Harrington 69kV 69 6 Solar Withdrawn Oct 2024
AC2-186 Raceway Solar 25 3.8 Solar Under Construction Aug 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Kent County, DE

All 34 PJM queue filings in Kent County, DE.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first