Cromby substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| B25 | Cromby 230kV | 230 | 870 | Gas | Withdrawn |
| I08 | Cromby 230kV | 230 | 870 | Gas | Withdrawn |
| U1-014 | Cromby | n/r | 700 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.