Medford substation interconnection queue
1 active project totaling 0.4 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Medford as the point of interconnection, all in Burlington County, NJ.
Target commercial operation dates as filed run from Feb 2012 to Dec 2014 (3 filings).
1active projects
0.4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| W3-031 | Medford 69kV | 69 | 7.6 | Solar | Withdrawn | Feb 2012 |
| W4-029 | Reeve's Station North | 13 | 0.9 | Solar | Withdrawn | Dec 2014 |
| Y1-075 | Reeve's Station South | 13 | 0.4 | Solar | In Service | Dec 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Burlington County, NJ
- Burlington: 8 active, 450.1 MW of 24 filed
- Crosswicks: 2 active, 161 MW of 3 filed
- Southampton: 2 active, 81.1 MW of 7 filed
- Lumberton: 2 active, 6.8 MW of 14 filed
- Cookstown-Fort Dix: 2 active, 4.5 MW of 3 filed
- Trenton: 1 active, 3 MW of 6 filed
- Levittown: 2 active, 2.7 MW of 7 filed
- Mt. Holly: 1 active, 2.7 MW of 3 filed
- Wrightstown: 1 active, 2.3 MW of 4 filed
- Bustleton: 1 active, 2.1 MW of 5 filed
- Deptford: 1 active, 1.9 MW of 6 filed
- Cookstown: 1 active, 1.9 MW of 3 filed
- Cinnaminson: 2 active, 1.4 MW of 2 filed
- TBD: none active of 20 filed
- Camden: 1 active, 0 MW of 8 filed
- Tabernacle: none active of 7 filed
- North Hanover: none active of 4 filed
- Yardville: none active of 3 filed
- Cookstown-New Lisbon: none active of 2 filed
- Cox's Corner: none active of 2 filed
All 118 PJM queue filings in Burlington County, NJ, including 2 more substations.