Substation Scout

McDowell substation interconnection queue

2 active projects totaling 401.9 MW in the PJM queue, plus 5 with terminal status (shown grayed).

7 PJM queue filings name McDowell as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Dec 2021 to Dec 2031 (6 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: ATSI (1 filing).

2active projects
401.9active MW
7total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-2166 McDowell 138 kV 138 400 Battery Active Dec 2031
AH2-236 McDowell 138 kV 138 100 Battery Withdrawn Dec 2027
AE1-141 McDowell 138 kV 138 33 Hybrid Withdrawn Dec 2021
AE1-239 McDowell 138 kV 138 22.9 Solar Withdrawn Dec 2021
AE2-277 McDowell 138 kV 138 16 Solar Withdrawn n/r
AH2-023 McDowell 12.47 kV 12.5 3.4 Solar Withdrawn Dec 2024
AG1-251 Springfield CSG 1 12.5 1.9 Solar Suspended Aug 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: McDowell (ATSI, 6 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Mercer County, PA

All 57 PJM queue filings in Mercer County, PA.

Other PJM queue substations in Delaware County, PA

All 27 PJM queue filings in Delaware County, PA.