Cumberland substation interconnection queue

4 active projects totalling 388.9 MW in the PJM queue, plus 6 with terminal status (shown greyed).

4active projects
388.9active MW
10total filed
Queue IDProjectkVMWResourceStatus
C01-2119 Cumberland 230 kV 230 280 Battery Active
AB2-102 Cumberland 230 225 Gas Withdrawn
AG2-308 Cumberland 138 kV 138 100 Battery Withdrawn
AF1-081 Cumberland 230 kV 230 96 Solar Withdrawn
P06 Cumberland 2 230 88.1 Gas In Service
AF2-022 Cumberland 138 kV 138 50 Battery Withdrawn
AE2-205 Cumberland 230 kV 230 46.8 Solar Withdrawn
AG2-297 Cumberland 230 kV 230 11.4 Solar Active
T54 Cumberland Unit 1 138 9.4 Gas In Service
AG2-071 Cumberland 12 kV 12 1.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.