Burches Hill-Brandywine substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Burches Hill-Brandywine as the point of interconnection, all in Prince George's County, MD.
Target commercial operation date as filed: Mar 2022 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X3-087 | Mattawoman Energy | 230 | 744 | Gas | Withdrawn | Mar 2022 |
| Z2-060 | Mattawoman Energy | 230 | 116 | Gas | Withdrawn | Mar 2022 |
| AA2-170 | Mattawoman Energy | 230 | 92 | Gas | Withdrawn | Mar 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Prince George's County, MD
- Cheltenham: 4 active, 1,266.3 MW of 4 filed
- Burches Hill-Chalk Point: 2 active, 780 MW of 3 filed
- Chalk Point: 2 active, 676.2 MW of 5 filed
- Oak Grove: 6 active, 398.8 MW of 9 filed
- Aquasco: 1 active, 200 MW of 2 filed
- St. Barnabas: 1 active, 2.4 MW of 3 filed
- Prince George's County: 1 active, 0.8 MW of 2 filed
- TBD: none active of 20 filed
- Burches Hill: none active of 7 filed
- Talbert: none active of 3 filed
- Chalk Point-Bowie: none active of 2 filed
- Hawkins Gate / Oak Grove: none active of 2 filed
- Livingston Road: none active of 2 filed
- Ritchie: none active of 2 filed