Cabin Creek substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Cabin Creek as the point of interconnection, all in Kanawha County, WV.
Target commercial operation dates as filed run from Mar 2024 to Dec 2025 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-043 | Cabin Creek 138 kV | 138 | 140 | Hybrid | Withdrawn | Dec 2025 |
| AH2-278 | Cabin Creek 138 kV | 138 | 100 | Battery | Withdrawn | Mar 2024 |
| AH2-209 | Cabin Creek 138 kV | 138 | 63 | Hybrid | Withdrawn | Mar 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Kanawha County, WV
- Kanawha River - Carbondale: 2 active, 117.8 MW of 3 filed
- TBD: none active of 20 filed
- Carbondale: none active of 2 filed